Enhanced Work Schedule Configuration
Users can now create complex work schedules with multiple shifts or defined off-duty windows (e.g., 6:00–14:00 & 15:00–23:00). Work schedules can be assigned to assets or users and are now applied based on each asset’s location time zone or the user’s profile time zone.
Follow the steps below to add a Work Schedule:
-
Log in to Unity
-
From the Navigation Panel on the left-hand side, click the Settings module
-
Select the Work Schedules tab from the top
-
To add a new work schedule, click the + button
-
An empty new work schedule form will be displayed on the right-hand side, type in a Work Schedule Name
-
Within the Grace period section, you can specify the desired Departure Delay in minutes to express the expected start time for the shift. Any time within the grace period will be considered as working hours.
-
Specify the desired Return Delay in minutes to express the expected end time for the shift. Any time within the grace period will be considered as working hours.
For example, assets are taken home by drivers, and we know it takes them 30 minutes prior to their shift to get to the warehouse for loading.
-
Click the + Work Shift button
-
Select the day of the week
-
Specify the Start time and End time
-
repeat steps 9 and 10 for all of the days that you would like to include in the work schedule
-
Click the Apply button
The Work schedule will be available from the All Schedules list.
Note: Work schedules can be assigned to People and Assets. Click the 3-dots menu to access the shortcut to the People list and Assets list pages.