How To – Accept/Reject Repaired Defects
If any defects have been marked as repaired in the Unity web app since the last time the asset was inspected, those defects will show as repaired within the schedule.
If any defects show as repaired, you must review that repair and you can accept that the repair of that defect was completed to your satisfaction, or you can reject the repair. If the defect is marked as repaired, it will be removed from the new DVIR as a defect.
If you mark the defect as not repaired, it will go back to its original severity of major or minor and be submitted with the new DVIR. The status of that defect in Unity will also switch back to its original severity rather than showing as repaired.